| Project description: |
 |
 |
Complete replacement of bridge deck in reinforced concrete, involving 5 2.7 km long traffic lanes, and representing an area of approximately 60,000 square meters. |
 |
Major changes in the “Craig Curve”s geometrical lane configuration. |
 |
New, 2.8 km long bicycle path on the west side (upstream). |
 |
Replacement of existing sidewalk on the east side (downstream) by a new one measuring 1.5 meters wide. |
| Challenge: |
 |
 |
Estimating the project and work sequences |
 |
Obligation to respect reopenings of traffic lanes every morning |
 |
Replacement of the « Craig » curve deck in one week-end |
| Value of contract: 100 M $. |
 |
|
|
 |
 |
 |
 |
 |
|